Masonry Rebuild Start

Starting to fill the masonry cavity

All the loose mortar remove, starting layer completed

Once all the loose material has been remove, we went down about six inches below ground level, a starting layer is built. Using mortar and correctly sized stone, we create a level surface inside the hole.